Day 438 - Gutters
Thursday , August 10 -- Kelli
was going to be onsite today, but after reviewing the quantity of remaining
front stone at 7a.m., it was obvious that a trip to Redding to get more
tread and riser stone was needed.
While she was gone, the gutter company arrived from Eureka to install
the gutters. It appears that they got most of the installation done...


Dave continued preparing for the deck railing
installation. Another item on Kelli's shopping list was post hardware
- 150 stainless steel washers, many lock washers, bolts, and nuts.

Pete and John continue on with the front steps...

Rick dug ditches for the landscaping water lines...

Aside from the stone and hardware, Kelli also picked up the vinyl
tile for the exercise room, laundry landing, and hangar stair landing;
went to a locksmith to get the key "code" for the front door so that
we can buy a deadbolt for the laundry room door that is keyed the same;
and checked out fireproof safes. |